By Mahtab Lahijany, smallbizOPTIMIZE | Australian SME edition, Queensland focus | Book 05 of 07 | 18 November 2026
Pricing, Margin and Cash Flow
A practical workbook to price the work, understand what remains and plan when the money will be available.
— Mahtab Lahijany
Revenue only becomes useful when the business keeps enough from each sale and collects the cash in time to meet its commitments. Price, margin and cash timing are three connected numbers, and every owner needs to control all three.
Key Takeaways
- Gross margin, contribution and operating margin answer different questions. In the base case below they are 40%, 30% and 6% of the same sales.
- Markup and margin are not the same: a 40% markup on $90 gives $126 and only a 28.6% gross margin.
- A 10% discount at a 30% contribution ratio needs 50% more volume just to keep the same contribution.
- Price service work from realistic chargeable hours, not hours worked: the same costs need $120 an hour at 1,200 hours but $144 at 1,000.
- Profit is not cash. A $9,000 monthly operating result can still leave the bank balance $13,000 lower once receivables, stock, tax, capital spending and loan principal are counted.
Connect Pricing and Margin With Cash Timing
Contribution analysis examines what remains after variable costs; cash forecasting examines receipt and payment dates (business.gov.au, 2025; Franklin et al., 2019, Chapter 3). This guide helps you choose commercially sound work and fund its delivery.
Build, Serve, Evaluate
Build establishes costs, capacity and operating controls. Serve defines customer value, scope, price and payment terms. Evaluate compares realised prices, contribution, operating results and cash headroom. Use supporting records; averages can conceal differences between jobs, products and customers.
I use Evidence → Commercial Judgement → Decision, the discipline underpinning The Triangle Acquisition Method™ (TAM), here in an operating context. Build–Serve–Evaluate and the review tools are author-developed applications of the cited principles, not a validated scoring system or a guarantee of profit.
Australian commercial education with a Queensland focus. Examples use fictional Australian dollars. Earnings and pricing exclude GST unless stated; cash schedules include applicable GST movements. Obtain current accounting, tax and legal advice for your circumstances.

Chapter 1 · Cost basis
Establish the Cost and GST Basis
A pricing decision needs a consistent cost base. Business Queensland (2022) recommends investigating business costs, customer value and competitor offers.
Begin with the records that distinguish the price charged, the cost of supplying the offer and the payment dates.
Classify costs by the question you are answering
Separate cost of sales used in the accounts from costs classified as variable or fixed for a decision. Direct cost does not automatically mean variable cost: a salaried technician may be a direct delivery cost while remaining fixed within the current capacity range. Record mixed and step costs explicitly (Franklin et al., 2019, Chapters 2–3).
Include the owner’s operating work when testing the model. A sole trader cannot pay themselves a deductible salary; the ATO treats a nominal wage as a profit distribution (Australian Taxation Office [ATO], 2026a). Keep this management allowance separate from tax deductions and drawings.
Use one GST basis in each calculation
GST credits depend on registration, the acquisition and the required evidence (ATO, 2026b). Exclude recoverable GST from cost comparisons; include irrecoverable GST where it is a real cost. Do not divide every expense by 1.1: there is no GST on wages (ATO, 2026c).
Illustration: a fully taxable $165 sale comprises $150 revenue and $15 GST. An eligible $88 purchase comprises $80 cost and $8 recoverable GST. A $40 wage remains a $40 cost. Confirm actual eligibility and your GST accounting basis with your tax adviser.
Name the Margin Before Using the Number
Gross profit, contribution and the final operating result answer different questions. Contribution deducts variable costs; gross profit uses the business’s cost-of-sales classification (Franklin et al., 2019, Chapter 3).
Table 1. The Fictional Base Case Used in the Pricing Examples
| Component | Per unit | Monthly at 1,000 units |
|---|---|---|
| Selling price / revenue | $150 | $150,000 |
| Cost of sales | −$90 | −$90,000 |
| Gross profit | $60 | $60,000 |
| Other variable selling / delivery costs | −$15 | −$15,000 |
| Contribution | $45 | $45,000 |
| Fixed operating costs | — | −$36,000 |
| Operating result | — | $9,000 |
Gross margin: $60 ÷ $150 = 40%
Contribution ratio: $45 ÷ $150 = 30%
Operating margin: $9,000 ÷ $150,000 = 6%
These percentages are not interchangeable. Trace freight, transaction charges, commissions, rework and returns to the appropriate record, and count each cost once.
Decision. Put the margin definition, period and cost treatment beside every reported percentage. A higher gross margin does not establish that fixed costs or cash commitments can be met.
Chapter 3 · Price
Build the Price From Costs and Customer Value
Hinterhuber (2008) examines obstacles to customer value-based pricing, including understanding and communicating value.
Use customer evidence alongside cost calculations and comparable offers. A formula tests the economics of a price; it does not establish what a customer will accept.

Keep markup and margin distinct
Markup on cost = (price − cost base) ÷ cost base
Price for target margin = cost base ÷ (1 − target margin)
At a $150 price and $90 cost of sales, markup is 66.7% and gross margin is 40%. Using $90 and a 40% gross-margin target gives $150. Applying a 40% markup instead gives $126 and only a 28.6% gross margin.
Allow for a cost that changes with the price
P = C ÷ (1 − r − m)
Here C is unit variable cost excluding a separate price-proportional fee, r is that fee rate and m is the target contribution ratio (rates as decimals; r + m must be below 1). If $105 unit costs exclude a further 2% fee on the ex-GST price, a 30% contribution target requires $105 ÷ 0.68 = $154.4118: round up to $154.42. This models a business cost, not permission to levy a customer surcharge.
Decision. Test the calculated price against customer value, demand, scope and delivery capability. Redesign the offer or economics where the supported price cannot sustain them.
Calculate Break-Even and Test Capacity
Cost-volume-profit analysis uses assumptions about selling prices, cost behaviour and activity range. Break-even occurs where the model covers its variable and fixed costs (Franklin et al., 2019, Chapter 3).
Break-even units = fixed costs ÷ contribution per unit
Break-even sales = fixed costs ÷ contribution ratio
Target units = (fixed costs + target profit) ÷ unit contribution
In the base case, $36,000 ÷ $45 = 800 units, or $36,000 ÷ 30% = $120,000 revenue. An $18,000 operating-profit target needs ($36,000 + $18,000) ÷ $45 = 1,200 units. If practical capacity is 1,100 units, the maximum modelled result at unchanged economics is $13,500. An ambitious sales target cannot create the missing capacity.
For a mixed business, use a supportable sales mix and weighted contribution ratio, then test a weaker mix. Recalculate where a new shift, employee, premises or equipment changes fixed costs. A zero or negative unit contribution cannot produce a meaningful break-even target.
Calculate What a Discount Must Earn Back
A price change alters unit contribution when the defined unit variable cost is held constant. Use the arithmetic before approving a discount, then test customer response.
Table 2. Price Changes at Unchanged Unit Variable Cost
| Measure | Base | 10% discount | 5% increase |
|---|---|---|---|
| Selling price | $150 | $135 | $157.50 |
| Unit variable cost | $105 | $105 | $105 |
| Unit contribution | $45 | $30 | $52.50 |
| Contribution at 1,000 units | $45,000 | $30,000 | $52,500 |
| Operating result after $36,000 fixed costs | $9,000 | −$6,000 | $16,500 |
| Units preserving $45,000 contribution | 1,000 | 1,500 | 857.14 |
The discount requires 50% more units to preserve contribution. The increase permits about 14.3% fewer units before total contribution falls below the base case; at least 858 whole units are required. At the 1,100-unit practical capacity, 1,500 units cannot be delivered without changing the model.
Decision. Require a stated purpose, contribution effect, realistic volume, capacity check and cash date for each material discount. Consider a change in scope, quantity or service terms where it better fits the customer and the economics.
Respond to Cost Increases Deliberately
Pricing should reflect the offer’s costs, customer value and commercial objectives (business.gov.au, 2026). When costs change, decide which result you intend to protect: restoring a contribution amount and restoring a contribution percentage can require different prices.
Table 3. A 10% Increase in All Unit Variable Costs
| Measure | Base | Costs rise, price held | Restore 30% ratio |
|---|---|---|---|
| Selling price | $150 | $150 | $165 |
| Unit variable cost | $105 | $115.50 | $115.50 |
| Unit contribution | $45 | $34.50 | $49.50 |
| Contribution ratio | 30% | 23% | 30% |
To restore only the original $45 unit contribution, the price is $115.50 + $45 = $160.50. To restore the 30% ratio, it is $115.50 ÷ 70% = $165. At 1,000 units and a held $150 price, the $34,500 contribution leaves a $1,500 operating loss.
Investigate the cause before passing on a number: separate supplier price, purchasing quantity, material yield, rework, labour time and sales mix. A larger invoice caused by greater volume is different from a higher cost per acceptable unit.

Chapter 7 · Service capacity
Price Service Capacity You Can Actually Sell
Hourly pricing needs to account for the business’s costs, including wages and associated employment costs (business.gov.au, 2026).
For a service model, estimate realistic chargeable hours as well as the cost of having people available.
Table 4. A Separate Annual Service-Rate Illustration
| Input | Assumption |
|---|---|
| Operating role cost, including employment on-costs | $84,000 |
| Other annual overheads, excluding that role | $36,000 |
| Target operating profit before interest, tax and depreciation | $24,000 |
| Total amount to recover | $144,000 |
| At 1,200 chargeable hours | $120 per hour |
| At 1,000 chargeable hours | $144 per hour |
Allow for leave, training, travel, quoting, administration, rework and time between jobs. Distinguish hours worked, hours charged and hours actually recovered through accepted invoices, and check whether a fixed-price job consumes more hours than its quote allows.
The annual role cost is already included above, so do not add the same salary again as an overhead. For a short-term job decision, identify which labour costs actually change if the job is accepted; allocated hourly cost and incremental cost serve different decisions.
Compare Customers and Channels After Their Costs
A sale’s commercial result depends on the costs relevant to supplying it. Short-term decisions should consider relevant future costs and benefits (Franklin et al., 2019, Chapter 10).
Table 5. Two Fictional Customers With the Same Contribution
| Monthly item | Customer A | Customer B |
|---|---|---|
| Sales | $30,000 | $20,000 |
| Variable cost of sales | −$18,000 | −$11,000 |
| Gross profit | $12,000 | $9,000 |
| Additional avoidable serving costs | −$4,000 | −$1,000 |
| Contribution after these costs | $8,000 | $8,000 |
For A, the $4,000 comprises $1,500 delivery, $1,000 rework, $900 commission and $600 extra paid processing. If processing is performed within an unchanged salary, describe the time or opportunity cost separately rather than claiming an immediate cash saving. Similar contribution does not mean similar value: compare capacity consumed, collections, recurring demand, complaints and dependence on the relationship.
Decision. Choose a specific response: repair service, change future scope or pricing, improve collection, redesign the channel or review an orderly exit within contractual obligations.
Protect the Contribution of Scarce Capacity
Where a resource constrains delivery, contribution per unit of that resource can inform the work mix (Franklin et al., 2019, Chapter 10). Establish the actual constraint and feasible demand before using the ranking.
Table 6. A Separate Constrained-Technician Illustration
| Measure | Job A | Job B |
|---|---|---|
| Selling price | $900 | $700 |
| Relevant variable cost | −$540 | −$420 |
| Contribution per job | $360 | $280 |
| Constrained technician hours | 3 | 1.5 |
| Contribution per constrained hour | $120 | $186.67 |
A contributes more per job; B contributes more per constrained hour. For a one-off order, compare additional receipts with avoidable costs and displaced contribution. For clearance stock already purchased, separate historical book cost from the future-cash decision: cash recovery does not demonstrate profitable replenishment.
Chapter 10 · Working capital
Calculate the Cash Tied Up in Growth
The cash conversion cycle combines inventory days and receivable days, less payable days (Dahlquist & Knight, 2022, Chapter 19).
Deloof (2003) studies working capital and profitability in large Belgian firms; those findings do not establish an optimal cycle for an Australian SME.

Table 7. A Separate Steady-State Trade Working-Capital Illustration
| Component | Annual activity / days | Average balance |
|---|---|---|
| Trade receivables | $1,460,000 credit sales / 45 days | $180,000 |
| Inventory | $876,000 cost of sales / 30 days | $72,000 |
| Trade payables | $876,000 credit purchases / 20 days | −$48,000 |
| Trade working capital | Receivables + inventory − payables | $204,000 |
Cash cycle = receivable days + inventory days − payable days
45 + 30 − 20 = 55 days
If activity and every listed balance rise 20% at unchanged prices, costs and timing, this model needs another $40,800 in trade working capital ($204,000 × 20%). That is additional funding tied up in trading, not an expense or the total funding requirement.
Decision. Model growth before accepting it. Review stock availability, agreed supplier terms and collection dates together; the complete cash forecast must also include tax, other accruals, debt and capital expenditure.
Reconcile Profit to the Bank Movement
Earnings and cash flows measure different aspects of performance (Dahlquist & Knight, 2022, Chapters 5–6). The bridge below uses the base case’s $9,000 operating result to show how trading balances and other payments absorb cash.
Table 8. An Illustrative Monthly Earnings-to-Cash Bridge
| Movement | Cash effect |
|---|---|
| Operating result before interest, tax, depreciation and amortisation | $9,000 |
| Increase in trade receivables | −$12,000 |
| Increase in inventory | −$6,000 |
| Increase in trade payables | +$4,000 |
| Interest and income tax actually paid | −$2,500 |
| Net GST cash movement, including BAS settlements | −$500 |
| Capital expenditure excluding recoverable GST | −$3,000 |
| Loan principal repaid | −$2,000 |
| Net cash movement | −$13,000 |
With $25,000 opening cash, these movements leave $12,000. The receivable and inventory increases alone absorb more than the operating result. Ask your accountant to reconcile actual opening and closing bank balances, and distinguish recurring improvement, collection of an old debtor, stock release, borrowing and delayed payment.
Forecast the Date of the Funding Gap
A cash forecast estimates receipts and payments for future periods (business.gov.au, 2025). Use a rolling 13-week schedule, with daily inspection around material commitments, starting from reconciled available cash and separately identified committed funding.
Table 9. A Six-Week Forecast and Delayed Receipt Case ($000)
| Week | Receipts | Payments | Base close | Delayed close |
|---|---|---|---|---|
| 1 | 25 | 30 | 15 | 15 |
| 2 | 32 | 30 | 17 | 7 |
| 3 | 28 | 35 | 10 | 0 |
| 4 | 36 | 31 | 15 | 15 |
| 5 | 34 | 32 | 17 | 17 |
| 6 | 35 | 33 | 19 | 19 |
Against an owner-selected $12,000 floor, the base case is $2,000 short in week 3. The delayed case breaches the floor in week 2 and reaches zero in week 3: a $12,000 gap. Both cases finish week 6 at $19,000, but the earlier payment exposure still needs a solution. The floor is a management limit, not a legal solvency test.
Decision. Document feasible operating changes or committed funding before the affected payments fall due. If company payment ability is in doubt, seek prompt accounting and legal advice (Australian Securities and Investments Commission [ASIC], 2024). A forecast receipt is not funding merely because it is in the sheet.

Chapter 13 · Payment terms
Agree Clear Prices and Payment Rules
Clear invoicing, payment terms and debtor follow-up support cash management (Business Queensland, 2024).
Agree scope, variations, acceptance, invoicing milestones and payment arrangements before relying on the receipt date.
Make collection an accountable operating task
For a material invoice, identify the customer’s approver, due date, supporting delivery record, any dispute and the next contact. Record promised payment separately from money received, and negotiate a change to supplier terms rather than silently assuming a later payment date.
A 2% early-payment discount on a $10,000 ex-GST invoice reduces revenue by $200. If relevant variable costs remain $7,000, contribution falls from $3,000 to $2,800: a 6.7% reduction. Test whether the acceleration, collection risk and funding alternatives justify that cost.
Use current Australian price-display rules
The ACCC requires consumer price displays to show the minimum total price, including taxes and unavoidable charges; business-only displays have a GST exception (Australian Competition and Consumer Commission [ACCC], n.d.). The ACCC also states that from 1 October 2026 businesses may no longer surcharge payments made using Visa, Mastercard, American Express or eftpos credit, debit or prepaid cards. Include payment-acceptance costs in the business model and check current guidance before changing customer charges.
Test a Commercial Change With Evidence
A proposed price is an operating hypothesis until the business observes demand, delivery costs and collection (Hinterhuber, 2008). State the mechanism before the target:
- Price: which defined offer, customer group and scope will change, by how much, from what date, and which approvals are required?
- Margin: which costs stay constant, move with price or volume, or increase in steps? What contribution and operating result are expected?
- Cash: when are implementation costs, additional stock, delivery costs and receipts due, and what funding is committed?
Set a baseline, accountable person, observation period and stop condition. Where feasible, trial a defined segment first. Keep Proposed, Implemented and Demonstrated results separate, and give each claimed saving its own test: if the original cost remains payable, the action has not yet produced the claimed cash saving.
Run the Weekly Price, Margin and Cash Review
ISO identifies evidence-based decision making and improvement as quality-management principles (International Organization for Standardization [ISO], n.d.). Use a small, consistently defined dashboard.
Table 10. A Compact Owner Review Dashboard
| Control | Measure and decision use |
|---|---|
| Realised price | Net sales after discounts and credits divided by comparable units or hours; inspect mix. |
| Defined gross margin | Gross profit divided by net revenue; use the same cost-of-sales classification. |
| Contribution | Sales less defined variable costs; review dollars, ratio and constrained capacity. |
| Operating result | Contribution less fixed costs on the stated earnings basis; compare actual and plan. |
| Collections | Overdue balances, disputes and actual versus forecast receipts, by accountable owner. |
| Trading funds | Receivables, inventory and payables; inspect quality, timing and growth requirements. |
| Cash headroom | Lowest forecast available cash less the chosen floor; show date and confirmed remedy. |
Begin with obligations and any essential funding gap, then examine price realisation, cost changes, work mix and the cause of the earnings variance. Finish with a limited action list, responsible people and deadlines. A better price can still require more working capital; a cash receipt can occur without recurring profit.
Working tools
Your Price, Margin and Cash Toolkit
Six author-developed working tools turn this guide into dated records. Complete them with current figures and your accountant’s confirmed definitions.
They are not a professional valuation, tax calculation or solvency certificate.

1. The six-dimension financial diagnostic
For each material finding, record a source, period and status (Verified, Partial, Missing or Adverse), then assess its commercial consequence separately; this is not an aggregate pass score.
- Financial health: are price, cost, earnings and available cash reconciled on a consistent basis?
- Operations: do actual time, yield, rework and capacity support the quoted economics?
- People: are role costs, chargeable hours, authority and backup capability realistic?
- Customers: what supports value, acceptance, scope, repeat demand and payment?
- Systems: can quotes, costs, invoices, credits and receipts be traced reliably?
- Leadership: who approves exceptions, reviews results and acts on a funding gap?
2. The price and margin calculator
Using consistent ex-GST amounts, record the offer, unit or hour, segment and period, then calculate gross profit (P − cost of sales), gross margin (gross profit ÷ P), markup (gross profit ÷ cost of sales), unit contribution (P − all unit variable costs), contribution ratio, break-even units (F ÷ unit contribution), target units ((F + target profit) ÷ unit contribution) and the shortfall against practical capacity and supported demand. For a proposed price use P = C ÷ (1 − m), or P = C ÷ (1 − r − m) with a price-proportional fee. A calculated price is not evidence of demand.
3. The quote or discount decision record
Use one record for each material quote, discount, scope variation or service-rate decision: base and proposed net price and the reason for the difference, variable cost, fees and extra fixed cost, contribution per unit (base and proposal), required units to preserve base contribution (base total contribution ÷ proposed unit contribution), demand evidence and capacity, contribution displaced from other work, deposit and collection date, cash required before receipt, and contract, GST and price-display checks. Do not treat allocated overhead as an avoidable saving without evidence.
4. The cash and trading-funds calculator
Record opening available cash and committed facilities, the lowest base-case and weaker-case cash with dates and gaps, and the approved remedy. Then estimate receivable, inventory and payable days, the cash cycle and the additional trade funds growth requires: (receivables + inventory − payables) × growth rate. Add tax, payroll, capital, debt and implementation needs from the full rolling forecast.
5. The 90-day financial control plan
Days 1–30: establish definitions and the baseline
- Reconcile current sales, credits, costs, receivables, stock, payables and bank cash.
- Confirm GST treatment and gross-margin, contribution and earnings definitions.
- Cost representative products, jobs or services, including owner operating work.
- Calculate break-even, practical capacity, the cash forecast and a weaker case.
Day 30 gate: reliable inputs, named uncertainties, dated obligations and up to three specific priorities. Escalate an essential unresolved funding requirement promptly.
Days 31–60: implement limited commercial changes
- Test selected price, scope, purchasing, delivery or collection changes.
- Record implementation cash, continuing cost, capacity and customer effects.
- Verify price-display and contractual requirements before changing offers.
- Compare realised prices, actual contribution and receipts with the proposal.
Day 60 gate: distinguish proposed, implemented and demonstrated results, and refresh working-capital needs and the weaker cash case before extending the change.
Days 61–90: verify repeatability and decide
- Check whether gains persist across representative work and customer groups.
- Reconcile earnings to bank movements, including tax, debt and owner payments.
- Review capacity, service quality and the cost of financing additional growth.
- Complete the decision memorandum and assign the next operating priorities.
Day 90 gate: continue, revise or seek specialist intervention on current evidence. Name the next capital decision, responsible people and review date.
6. The price, margin and cash decision
Record the commercial objective and the evidence for the chosen offer or work mix, realised price, defined gross margin and contribution, operating result against break-even and capacity, the lowest forecast cash with the weaker-case gap and committed remedy, and any dependency needing action. Then choose a position:
- Continue and verify: current evidence supports the price, delivery economics and funded cash plan. Identify remaining conditions and the next observation.
- Revise and test: price, cost, mix, capacity or payment assumptions need a defined change. Record the trial, cost limit, owner, deadline and evidence.
- Seek specialist intervention: payment ability, records or an essential commercial condition is adverse or unresolved. Obtain appropriate accounting, legal or restructuring advice promptly.
Final check: what does the customer pay, what remains after the defined costs, and when will the money be available? Reconcile the answers before committing to the next growth step.
Frequently Asked Questions
What is the difference between markup and margin?
Markup is profit as a percentage of cost; margin is profit as a percentage of the selling price. At a $150 price and $90 cost, markup is 66.7% and gross margin is 40%. Applying a 40% markup to $90 gives $126, which is only a 28.6% gross margin.
How do I calculate my break-even point?
Divide fixed costs by contribution per unit to get break-even units, or by the contribution ratio to get break-even sales. With $36,000 monthly fixed costs and $45 contribution per unit, break-even is 800 units or $120,000 of sales, within the stated cost and capacity assumptions.
How much extra volume does a discount need?
Divide the base total contribution by the new unit contribution. At a $150 price and $105 unit variable cost, a 10% discount cuts unit contribution from $45 to $30, so you need 50% more units just to keep the same $45,000 contribution, and that volume must be deliverable.
Why is my business profitable but short of cash?
Profit and cash measure different things. Growing receivables and stock, tax and GST payments, capital spending and loan principal all absorb cash without reducing the operating result. In this guide’s example, a $9,000 monthly operating profit still produces a $13,000 fall in the bank balance.
How should I set an hourly rate for a service business?
Add the full role cost including on-costs, other overheads and a target operating profit, then divide by realistic chargeable hours, not hours worked. $144,000 to recover needs $120 an hour at 1,200 chargeable hours but $144 an hour at 1,000. Price materials separately and test the rate against the market.
smallbizOPTIMIZE provides boutique business coaching and advisory support to help owners see priorities clearly and take practical steps with confidence. We support business health, optimisation and disciplined operating decisions alongside the qualified specialists responsible for their advice.
References
- Australian Competition and Consumer Commission. (n.d.). Price displays. https://www.accc.gov.au/business/pricing/price-displays
- Australian Securities and Investments Commission. (2024, December). Insolvency for directors. https://www.asic.gov.au/regulatory-resources/insolvency/insolvency-for-directors
- Australian Taxation Office. (2026a, April 17). Deductions for salaries, wages and super contributions. https://www.ato.gov.au/businesses-and-organisations/income-deductions-and-concessions/income-and-deductions-for-business/deductions/deductions-for-salaries-wages-and-super-contributions
- Australian Taxation Office. (2026b, September 14). When you can claim a GST credit. https://www.ato.gov.au/businesses-and-organisations/gst-excise-and-indirect-taxes/gst/claiming-gst-credits/when-you-can-claim-a-gst-credit
- Australian Taxation Office. (2026c, September 14). When you can’t claim a GST credit. https://www.ato.gov.au/businesses-and-organisations/gst-excise-and-indirect-taxes/gst/claiming-gst-credits/when-you-cannot-claim-a-gst-credit
- business.gov.au. (2025, May 22). Set up a cash flow statement. https://business.gov.au/finance/cash-flow/set-up-a-cash-flow-statement
- business.gov.au. (2026, October 1). Choose a pricing strategy. https://business.gov.au/products-and-services/choose-a-pricing-strategy
- Business Queensland. (2022, August 29). Pricing products and services. https://www.business.qld.gov.au/running-business/marketing-sales/marketing/strategy-planning/pricing-products-services
- Business Queensland. (2024, February 27). Cash flow, invoices and payments. https://www.business.qld.gov.au/running-business/finance/essentials/cash-flow-payments
- Dahlquist, J., & Knight, R. (2022). Principles of finance. OpenStax. https://openstax.org/books/principles-finance/pages/1-why-it-matters
- Deloof, M. (2003). Does working capital management affect profitability of Belgian firms? Journal of Business Finance & Accounting, 30(3–4), 573–588. https://doi.org/10.1111/1468-5957.00008
- Franklin, M., Graybeal, P., & Cooper, D. (2019). Principles of accounting, volume 2: Managerial accounting. OpenStax. https://openstax.org/details/books/principles-managerial-accounting
- Hinterhuber, A. (2008). Customer value-based pricing strategies: Why companies resist. Journal of Business Strategy, 29(4), 41–50. https://doi.org/10.1108/02756660810887079
- International Organization for Standardization. (n.d.). Quality management principles: The foundation for success. https://www.iso.org/quality-management/principles